The project comprised of the construction of a "Construction and Technology Development Centre" and ancillary premises at the Coleg Sir Gar Ammanford Campus, to comply with the approved Estates Strategy and allow the college to extend and develop links with local construction companies.

The scope of services provided by RVW Consulting included design of all substructures and superstructure, drainage, external works, retaining walls, stairs and car parking areas.

The project was delivered under a design and build contract and completed on time and to budget.

KEY FEATURES

  • Pad and strip footings with suspended beam and block ground floor.
  • Steel portal frame superstructure clad in brickwork.
  • External steps, ramps and retaining walls design and detailing.
  • Foul and surface water drainage design including diversion/protection of existing apparatus, and package pumping station.
  • Associated external works design and detailing of car parking areas.

 

Project Client

Colg Sir Gar

Architect

Pembroke Design

Project Value

£2.5m

Completion Date

May 2008